Our offshore experience

From wind farms to offshore platforms and subsea connections, our projects span the Middle East, Europe and Asia.

Projects delivered
10K+
Homes powered
2.5M
Offshore wind enabled
4,000+MW
Mattresses delivered
55K+
Grout bags delivered
200K+

Major projects

A selection of ULO’s major projects. Open a row for the full scope, the figures and, where ULO recorded one, how long it took.

Fabric formworks

Engineered fabric formwork for scour, seal and free-span correction.

3
  • Umm ShaifUnited Arab Emirates · ADNOC Offshore · EPCI NMDCSupply and installation of grout bags
    Scope
    Over 40 customized CS tunnel grout bags.
  • Grout bag supply – ADNOC & Saudi AramcoUnited Arab Emirates · ADNOC · Saudi AramcoSupply and installation of grout bags
    Scope
    Supply of over 5,000 grout bags for ADNOC and Saudi Aramco projects, in sizes customized to each design specification.
  • Pipeline rectification – DWP-215United Arab Emirates · Dubai PetroleumSupply and installation of grout bags
    Scope
    Free-span correction on subsea pipelines, using customized grout formulations with a double-shaft mixer, cavity pump and 40 MT vertical silos.

Let’s talk about your next project.

Talk to our team →